Menü
Extension of the Petőfi Sándor public school in Mór
Public buildings

Extension of the Petőfi Sándor public school in Mór

Extension of the Petőfi Sándor public school in Mór

Public buildings

Principal: Local Government Mór
Project: Our scope of services included the construction of a new two-story school over a basement. The masonry was made with 38-heights load-bearing brick walls including pillar reinforcement, after which a 26 cm thick hollow plank ceiling with a 9.3 m span was placed. The roof is made of wood with a sheet metal cover. A total of 8 classrooms and a staff room were created, social rooms are on each floor. The building is completely handicapped accessible, an elevator has also been installed. A seepage tank was moved in the courtyard to collect rainwater. A stage was also set up in the courtyard. The building has received 10 cm mineral wool insulation.